Project - Pier 1 Imports

 
 
Location: Minot, North Dakota
Total Area of ICF Wall: 7, 296 sq. ft.
Total Area of Building: 8,320 sq. ft.
Year Completed: February, 2001
Labor Time to Install: 284 man hours
 
ICF system/materials used include: Arxx Building System
 

Interesting facts about the structure that are personalized to this location
and building:

- Cost Savings: Contractor supplied a construction cost that was competitive with the original construction plans.
- Speed of Construction: A crew of 5 completed the structure within 7 days, including removal of bracing system.