Project - Washington Army National Guard Vehicle Bay Storage Facility

 
 
Location: Tacoma, WA
Total Area of Building: 6,800 sq. ft.
Year Completed: 1999
 
ICF system/materials used include: Quad-Lock
 

Interesting facts about the structure that are personalized to this location
and building:

- Increased seismic and lateral resistance compared with conventional wood framing.
- Ease and speed of installation.
-Due to the thermal mass effect there aren't any temperature swings normally associated with conventional wood framing. This allows the National Guard to benefit from measurable energy savings for both heating and cooling.